Why is there a proposed and alternate route?

There are several factors ITC looks at when routing a transmission line. They include several engineering, social and environmental factors. These can include criteria such as length, nearby residences or public facilities, wetland areas, historical and archaeological sites and cropland / center pivot irrigation presence. ITC analyzed hundreds of route options to determine the proposed and alternate routes per the requirements of the Michigan Electric Transmission Certification Act.